Registration fees allow WorkSafe WA to recover the costs associated with the registration and inspection of plant. Fees change annually to reflect the changes in costs. The current fees for registration can be found in the tables below.
General plant:
Application for: | Regulation | Fees as of 1 July 2024 |
---|---|---|
The registration of plant design or alteration to plant design | r. 250(4) | $702.00 |
The registration of an item of plant | r. 266(3) | $725.00 |
The replacement of a registration document | r. 288(4)(b) | $110.00 |
Changes to plant registration information | r. 284(1) | No fee |
Plant used exclusively on a mine site:
The fees associated with mining plant vary from that of general plant. This is because mine operators have paid the mines safety and inspection levy. This reduced fee is only available to mine operators registered in the Safety Regulation System (SRS) where the plant is exclusively used on a mine site.
Application for: | Regulation | Fees as of 1 July 2024 |
---|---|---|
The registration of plant design or alteration to plant design | r. 250(4) | $609.00 |
Registration of an item of plant | r. 266(3) | $67.00 |
The replacement of a registration document | r. 288(4)(b) | $110.00 |
Changes to plant registration information | r. 284(1) | No fee |