At its first meeting, held on 28 February 2007, the Market Advisory Committee (MAC) agreed to establish a permanent Working Group to assist System Management in considering, assessing and developing changes to the System Management Market Procedures which the WEM Rules require System Management to develop. The Working Group was to be summoned by System Management when new procedures were developed or existing procedures needed to be modified. On 8 November 2017 the MAC disbanded the Working Group as it had been replaced by the AEMO Procedure Change Working Group.
Working Group members
Member |
Company |
Representing on the Working Group |
Mike Davidson |
System Management |
Chair |
Fiona Edmonds |
Alinta Energy |
Industry Representative |
Tremayne Pirnie |
The Griffin Group |
Industry Representative |
John Nguyen |
Perth Energy |
Industry Representative |
Rene Kuypers |
Infigen Energy |
Industry Representative |
Steve Gould |
Community Electricity |
Industry Representative |
Stewart Richardson |
ERM Power |
Industry Representative |
Nick Walker |
Verve Energy |
Verve Energy |
John Rhodes |
Synergy |
Synergy |
Adrian Theseira |
System Management |
System Management |
Kate Ryan |
Independent Market Operator |
Independent Market Operator |
The Terms of Reference of the System Management Procedure Change and Development Working Group is available below.