At its first meeting, held on 28 February 2007, the Market Advisory Committee (MAC) agreed to establish a permanent Working Group to assist System Management in considering, assessing and developing changes to the System Management Market Procedures which the WEM Rules require System Management to develop. The Working Group was to be summoned by System Management when new procedures were developed or existing procedures needed to be modified. On 8 November 2017 the MAC disbanded the Working Group as it had been replaced by the AEMO Procedure Change Working Group

Working Group members

Member

Company

Representing on the Working Group

Mike Davidson

System Management 

Chair 

Fiona Edmonds

Alinta Energy

Industry Representative 

Tremayne Pirnie

The Griffin Group 

Industry Representative 

John Nguyen

Perth Energy 

Industry Representative 

Rene Kuypers

Infigen Energy 

Industry Representative

Steve Gould

Community Electricity

Industry Representative 

Stewart Richardson

ERM Power

Industry Representative 

Nick Walker

Verve Energy 

Verve Energy 

John Rhodes

Synergy 

Synergy 

Adrian Theseira

System Management

System Management 

Kate Ryan

Independent Market Operator

Independent Market Operator

The Terms of Reference of the System Management Procedure Change and Development Working Group is available below.

 

Meeting Papers and Minutes

Meeting 9 (28 October 2010)

Meeting 10 (12 December 2011)

Meeting 11 (14 August 2013)