Draft Electric Storage Resource Obligation Intervals WEM Procedure

Policy
AEMO’s draft Electric Storage Resource Obligation Intervals WEM Procedure has now been released for consultation.
Last updated:

An outline of this draft WEM Procedure was previously presented to the WEM Reform Implementation Group (WRIG) on 25 March 2021. 
 

The window for submitting feedback closed at 5:00pm on 13 May 2021.

Sidebar
Was this page useful?