AEMO’s draft Certification of Reserve Capacity for the 2022 and 2023 Reserve Capacity Cycles WEM Procedure

Policy
Australian Energy Market Operator (AEMO) has released a draft Certification of Reserve Capacity for the 2022 and 2023 Reserve Capacity Cycles WEM Procedure
Last updated:

The Australian Energy Market Operator (AEMO) released a draft Certification of Reserve Capacity for the 2022 and 2023 Reserve Capacity Cycles Wholesale Electricity Market (WEM) Procedure for consultation.

An outline of the Certification of Reserve Capacity for the 2022 and 2023 Reserve Capacity Cycles WEM Procedure was presented to the WRIG on 27 January 2022. 

The window for submitting feedback closed at 5:00pm on 18 February 2022.

You can download AEMO’s draft WEM Procedure from the link below.

Have a question or want to report a problem?

Fill in the form to get assistance or tell us about a problem with this information or service.

Send feedback