The Coordinator of Energy must develop a WEM Procedure which provides further detail on the operation of the GPS Dispute Resolution Mechanism, including the process for referring matters to the Generator Arbitrator, and the reasons where the Coordinator may determine that a Secondary Generator Arbitrator may be used in place of the Primary Generator Arbitrator.
The Coordinator of Energy's WEM Procedure: Dispute Resolution Process for Existing Transmission Connected Generating Systems states that referrals to dispute resolution must be made using two separate forms – the GPS Dispute Resolution Notice template and the GPS Dispute Resolution Notice: Response template. The Coordinator will consider the information provided in both documents prior to determining whether a Dispute is to be referred to arbitration.
You can find a copy of the WEM Procedure and the templates below.
GPS Dispute Resolution Notice (template)
For use by the Party who applies to the Coordinator for a Dispute to be referred to arbitration (Referring Party).
GPS Dispute Resolution Notice – Response (template)
To be used by the Party who is required to respond to the receipt of a GPS Dispute Resolution Notice (Responding Party).