Type: Standard Rule Change Proposal
Submitter: IMO
Title: Removal of Resource Plans and Dispatchable Loads
Market Rules Affected: 2.13.9, 2.16.2, 2.16.4, 2.16.12, 2.22A.1, 2.26.3, 2.27.1, 2.27.5, 2.27.15, 2.29.1A, 2.29.5, 2.29.8, 2.29.8A, 2.30B.2, 2.30B.13, 2.34.3, 2.34.8, 2.34.14, 2.35.1, 2.36.1, 2.37.5, 3.9.2, 3.9.6, 3.13.2, 3.13.3A, 3.13.3AB, 4.1.26, 4.10.1, 4.11.4, 4.12.1, 4.12.4, 4.18.1, 4.18.2, 4.25.2, 4.25.4, 4.26.2, 4.26.2B, 4.26.5, 6.3A.2, 6.3A.4, 6.3B.1, 6.4.1, 6.4.2, 6.4.3, 6.4.4, 6.4.5, 6.4.6, 6.4.6A (new), 6.4.6B (new), entire section 6.5, 6.5A, 6.5B, entire section 6.5C, 6.6.9, entire section 6.11, 6.11A.1, 6.12.1, 6.13, 6.15.1, 6.15.2, 6.16A.1, 6.16A.2, 6.16B.1, 6.16B.2, 6.17.1, 6.17.3, 6.17.4, 6.17.5, 6.17.5A, 6.17.6, 6.17.6A, 6.17.6C, 6.17.7, 6.17.9, 6.21.2, 7.1.1, 7.2.2, entire section 7.4, entire section 7.5, 7.6.1C, 7.6.2B, 7.6A, 7.6A.1, 7.6A.2, 7.6A.3, 7.6A.5, 7.7.4A, 7.7.5, 7.9.4, 7.9.8, 7.11.5, 7.13.1, 7A.1.3, 7A.1.6, 7A.2.1, 7A.2.3, 7A.2.4, 7A.2.4A (new), 7A.2.4B (new), 7A.2.4C (new), 7A.2.8, 7A.2.9, 7A.2.9A (new), 7A.2.10, 7A.2.12, 7A.2.13, most of section 7A.3, 7B.1.4, 7B.1.5, 7B.2.1, 7B.2.2, 7B.2.3, 7B.2.4, 7B.2.5, 7B.2.6, 7B.2.10, 7B.2.18, 7B.2.19, most of section 7B.3, 7B.4, 7B.4.1, 9.3.3, 9.3.4, 9.3.7, 9.8.1, 9.9.2, 9.11.1, 9.13.1, 9.18.3, 9.24.2, 10.5.1, 10.7.1, Chapter 11 (Glossary), Appendix 1, and Appendix 9
Date Submitted: 28 January 2015
Current Status: The Amending Rules commenced at 8:00 AM on 1 July 2019.
Event | Date | Comments |
---|---|---|
Notification Published | 28/01/2015 | |
First Submission Period | 29/01/2015 - 02/04/2015 | The submission period has been extended to 45 B-Days from the date the IMO published the Rule Change Notice. |
Further Submission Period | 22/01/2018 - 13/02/2018 | A call for further submissions was published on 22 January 2018. |
Draft Report Published | 31/08/2018 | The timeframe for publishing the Draft Rule Change Report was further extended in accordance with the Extension Notice published on 21 December 2017. |
Second Submission Period | 31/08/2018 – 01/10/2018 | The submission period is at least 20 B-Days from the date the Rule Change Panel published the Draft Rule Change Report. |
Final Report Published | 29/10/2018 | Must be published within 20 B-Days after the end of the second submission period. |
Ministerial Approval | 26/11/2018 | |
Commencement | 01/07/2019 |