Rule Change: RC_2010_33

A Rule Change Proposal made by Verve Energy 17 December 2010.
Last updated:

Type: Standard Rule Change Process

Submitter: Verve Energy

Title: Cost_LR

Market Rules Affected: 3.22.2, 3.22.3, 9.9.1, 9.9.1A, 9.9.2, 9.9.3, 9.9.3A (new), 9.9.3B, 9.9.4, 9.10A.1, 9.11.1 and the Glossary

Date Submitted: 17 December 2010

Current Status: The Amending Rules commenced on 1 November 2011

Event Date Comments
Notification Published 20/12/2010  
First Submission Period 21/12/2010 - 04/02/2011 The submission period is 30 B-Days from the date the IMO published the Draft Report
Draft Report Published 04/03/2011 Must be published within 20 B-Days of the end of the first submission period
Second Submission Period 08/03/2011 - 14/04/2011 The submission period is at least  20 B-Days from the date the IMO published the Draft Report
Final Report Published 16/05/2011 Must be published within 20 B-Days after the end of the second submission period
Commencement 01/11/2011  

 