Type: Standard Rule Change Process
Submitter: IMO
Title: Commissioning Tests and the Reserve Capacity Mechanism
Market Rules Affected: 3.21A.7, 3.21A.7A (new), 4.1.26, 4.10.1, 4.27.10, 4.27.10A (new), 4.27.11, 4.27.11A (new), 4.27.11B (new), 4.27.11C (new), 4.27.11D (new), 4.27.12, 6.5.1A and 6.5.1C.
Date Submitted: 10 April 2008
Date First Published on the IMO Website: 11 April 2008
Date Final Report Published: 18 August 2008
Current Status: Closed. The Amending Rules resulting from this Rule Change commenced at 08.00am on 1 September 2008
Event | Date | Comments |
---|---|---|
Proposal Received by IMO | 10/04/2008 | |
Notification Published | 11/04/2008 | |
First Submission period | 11/04/2008 – 23/05/2008 | The submission period is 6 weeks from the date the IMO published the notification |
Draft Report published | 23/06/2008 | Must be published within 20 B-Days after the end of the submission period |
Second submission period | 24/06/2008 – 21/07/2008 | The submission period is 20 B-Days from the date the IMO published the Draft Report |
Final Report Published | 18/08/2008 | Must be published within 20 B-Days after the end of the second submission period |
Rule Commencement | 01/09/2008 |