Type: Standard Rule Change Process
Submitter: IMO
Title: Information from Network Operators
Market Rules Affected: 4.11.5 and 10.2.2
Date Submitted: 10 June 2008
Date First Published on the IMO Website: 13 June 2008
Date Final Report Published: 20 October 2008
Current Status: Closed for public submissions. Procedure Change Report being prepared. Publication date TBA
Event | Date | Comments |
---|---|---|
Proposal Received by IMO | 10/06/2008 | |
Notification Published | 13/06/2008 | |
First Submission period | 13/06/2008 – 25/07/2008 | The submission period is 6 weeks from the date the IMO published the notification |
Draft Report published | 22/08/2008 | Must be published within 20 B-Days after the end of the submission period |
Second submission period | 25/08/2008 – 19/09/2008 | The submission period is 20 B-Days from the date the IMO published the Draft Report |
Final Report Published | 20/10/2008 | Must be published within 20 B-Days after the end of the second submission period |
Rule Commencement | 1/11/2008 |