Type: Standard Rule Change Proposal
Submitter: Public Utilities Office, on behalf of the Minister for Energy
Title: GSI Fee Arrangements - Inclusion of Registered Production Facility Operators
GSI Rules Affected: Subrules 114, 115A(1) (new),115A(2) (new), 115A(3) (new), 116(1), 116(2) (new), 116(3) (new), 117(3) (new), 117(4) (new), 118(1), 118(3), 118(4), 119(2), 119(4), 119(5), 119(6), 119(7), 120(1), 120(2), 120(3), 120(4) and Schedule 1.
Date Submitted: 9 July 2014
Current Status: The Minister approved the Final Rule Change Report on 2 December 2014. The Amending Rules commenced on 1 January 2015.
Event | Date | Comments |
---|---|---|
Notification Published | 15/07/2014 | |
First Submission Period | 16/07/2014 - 26/08/2014 | The submission period is 30 B-Days from the date the IMO published the Rule Change Notice. |
Draft Report Published | 02/10/2014 | The timeframe for preparing the Draft Rule Change Report was extended in accordance with the Extension Notice published on 23 September 2014 and the Extension Notice published on 26 September 2014. |
Second Submission Period | 03/10/2014 - 30/10/2014 | The submission period is at least 20 B-Days from the date the IMO published the Draft Report. |
Final Report Published | 24/11/2014 | Must be published within 20 B-Days after the end of the second submission period. |
Ministerial Approval | By 22/12/2014 | The Minister requires 20 B-Days to review the Final Rule Change Report and advise the IMO of a decision. |
Commencement | 01/01/2015 |