Type: Standard Rule Change Process
Submitter: Pilbara ISOCo
Title: Various Pilbara ISO Functions (Access and connection costs; ESS procurement; CPC measures)
Pilbara Networks Rules affected: Subchapter 9.2, Rule 244 and A4.73(b)
Date Submitted: 14 March 2023
Current Status: The Final Rule Change Report was published on 30 June 2023. The Amending Rules commenced on 1 July 2023.
Event | Date | Comments |
---|---|---|
Notification Published | 23/03/2023 | |
First Submission Period | 23/03/2023 - 08/05/2023 | The end of the submission period is at least 30 Business Days from the publication of the Rule Change Notice. |
Draft Rule Change Report Published | 12/05/2023 | The Draft Rule Change Report must be published within 20 Business Days from the end of the first submission period. |
Second Submission Period | 12/05/2023 - 12/06/2023 | The end of the submission period is at least 20 Business Days from the publication of the Draft Report. |
Final Rule Change Report Published | 30/06/2023 | The Final Rule Change report must be published within 20 Business Days after the end of the second submission period. |
Commencement | 01/07/2023 |