BP undertook environmental investigations and soil remediation works at the site in 1997 through to 2000. The results of the of the investigations identified contaminated soil and groundwater in the vicinity of the remote fill points located on the southern boundary and in the vicinity of the waste oil sump and triple interceptor trap located at the rear of the workshop building. BP excavated contaminated soil from the vicinity of the fill points in 1998 and waste oil sump in 2000.
Site management plan for former BP Bluff Point service station
Technical Report
A service station operated at the site for ~50 years, prior to closure and demolition in December 2008.