This report presents the findings from the PSI. The PSI was conducted to assess the site for potential soures of contamination and contaminants of concern, the receptors that may be exposed to contamination and the relevant pathways of contamination migration.
Preliminary Site Investigation - Leach Residue Storage Facility (2019)
Technical Report
Preliminary Site Investigation (PSI) conducted for the Bulong Tailings Storage Facility (TSF).