Under clause 23 of the Metropolitan Region Scheme and clause 13 of the Peel Region Scheme and Greater Bunbury Region Scheme, land included within the urban or industrial deferred zone may be transferred to the urban zone or industrial zone by resolution of the WAPC, notified in the Government Gazette.
These guidelines supersede the WAPC Guidelines for the Lifting of Urban Deferment (2019) and Greater Bunbury Region Scheme Guidelines for the Lifting of Industrial Deferment (2014).