This plan seeks to:
- protect the riverine environment of the lower Ord River as it has adapted to the changed flow regimes since the Ord River Dam was constructed
- provide for existing commitments to irrigation and hydro-power generation
- guide planning for the Western Australian portion of M2 Supply Area and irrigation developments on the lower Ord River downstream of House Roof Hill
- identify the potential for further hydro-electricity to be generated at the Ord River Dam and the Kununurra Diversion Dam
- indicate the potential for additional irrigation allocations to be made in the future.
Please download the document below.