Gingin surface water allocation plan 2011

Plan
The plan sets allocation limits and our approach for managing surface water resources in the Gingin area.
Last updated:

The plan describes how we will:

  • recover water by recouping unused entitlements to within the allocation limits
  • allocate and license surface water if water becomes available (including through trades)
  • manage the effect of upstream abstraction on downstream reliability
  • maintain surface water flow to minimise the risk to other users and environmental values
  • evaluate the performance of the plan against its objectives.

Please download the document below.

Was this page useful?